Barco iCon H600 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Projektoren Barco iCon H600 herunter. HB051B INSTALLATION INSTRUCTIONS Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 1
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
8803-000072 07/07/06
CHIEF MANUFACTURING INC. 1-800-582-6480, Fax: 1-877-894-6918, Email: chief@chiefmfg.com
HB-051B
VIDEO PROJECTOR CEILING MOUNT
FOR BARCO ICON H600,
The Chief HB051B video projector ceiling mount is designed to provide fast, simple and secure installation of the
Barco Icon H600. Special roll, pitch, yaw and horizontal adjustments simplify projection positioning for image
alignment. The HB051V mount also has positive registration lock so that the projector may be removed without losing
projector mount registration.
WARNING: IMPROPER INSTALLATION MAY RESULT IN SERIOUS PERSONAL
INJURY! All components must be securely fastened to each other and to the ceiling, AND
the ceiling MUST be capable of supporting 5 times the total weight of the installation. If it
cannot, the ceiling MUST be reinforced.
Unpack and check contents:
(1) Deluxe ceiling mount housing assembly. (3) ¼” washers, flat
(1) Barco mounting bracket (3) M8 x 1.25 x 20mm, BHCS, screws
(4) 5/16” Flange Nuts
INSTALLATION INSTRUCTIONS
1. Turn your projector upside down.
2. Place the Barco mounting bracket on the three adjustable feet on the bottom of the projector. The triangle in the
front center of the bracket should be facing the front of your projector and the three holes in the bracket should
line up with the three threaded inserts in the bottom of the projector.
3. Slide the (3) ¼” washers, one on each (3) M8 x 20mm Screw and install them into the three threaded inserts in
the projector. Securely tighten all three mounting screws at this time.
5. Be sure that the method of support you are using for the VCM ceiling mount is securely installed to the ceiling.
If not, the ceiling must be reinforced. Improper installation may result in serious personal injury.
6. Attach the VCM housing to your method of support and tighten firmly so the VCM housing is square to the
screen.
PRECAUTION: Installing a ceiling mount requires the presence of two persons familiar with
mechanical installations. A third assistant is recommended.
6. With the help of your assistants, lift the projector and install it to the four studs extending from the mounting
plate. Be sure the Barco mounting plate is seated in slots. Tighten securely using the (4) 5/16” flange nuts.
For projector alignment see attached sheet.
Seitenansicht 0
1

Inhaltsverzeichnis

Kommentare zu diesen Handbüchern

Keine Kommentare